← All articles

FOB vs DDP: Building a Landed Cost You Can Compare

A worksheet for comparing FOB and delivered quotes without inventing numbers that are not in the quotation.

FOB vs DDP: Building a Landed Cost You Can Compare

FOB and a delivered, DDP-style quote are two different bundles of responsibility, and comparing them without listing what each includes is the fastest way to misread a landed cost. Rebuild both into one worksheet with named lines before you decide which is cheaper.

What FOB includes and leaves out

Under FOB, the supplier's responsibility typically ends once the goods are loaded on board at the origin port, and the buyer takes the main carriage and everything after it. The quote therefore covers the goods and the origin-side work up to that point, but not the ocean or air freight, the destination clearance, or the delivery-side charges. Those become separate lines you or your agent arrange. Confirm the exact incoterm in the proforma invoice rather than assuming, because the point at which cost and risk move is defined by the term used. Our shipping and cargo consolidation service handles the origin-side work.

What a delivered, DDP-style figure adds

A delivered figure rolls more of the journey into one number, commonly the carriage and the destination-side handling. Duties and taxes are in many cases part of that bundle, but the exact treatment depends on the destination and the terms agreed, so keep them as named lines in a written quotation instead of attaching a number to them. Convenience is the appeal of a single figure; the drawback is that the split disappears, which is exactly what a landed-cost worksheet restores.

Build a landed-cost worksheet

Use one row per cost line so nothing is double counted: ex-works unit cost, origin-side handling, main carriage, destination-side charges, and any duties or taxes named in the quotation. Add the disclosed agent fee and any add-ons as their own rows. Then compare an FOB quote and a delivered quote after both have been expanded into that same set of rows. Do not fill a gap with an assumed figure; ask for it in writing. We show the approach in China sourcing agent fees and on the services page.

Where the agent fee sits in each case

This is the detail that catches people out. Plan B is 5% of FOB goods value with a minimum $100 per order, so the percentage is calculated on the goods value at the FOB point, not on freight, duties, or the delivered total. Plan A is a fixed project fee from $290 per project and does not move with the shipment at all. Either way the service fee is always disclosed and listed separately from the ex-works unit cost, with no hidden commission, no factory kickbacks, and no margin buried in the unit price, and add-ons appear on a published rate card. See sourcing agent commission explained.

Worksheet row FOB quote Delivered, DDP-style quote
Ex-works unit cost Named line Included in the single figure
Origin-side handling Named line Included in the single figure
Main carriage Buyer arranges, named line Included in the single figure
Destination-side charges Buyer arranges, named line Included in the single figure
Agent fee From $290 per project, or 5% of FOB goods value (minimum $100 per order) Same disclosed line, calculated on FOB goods value
Storage Free for the first 60 days, then billed by CBM/day Free for the first 60 days, then billed by CBM/day

All figures are indicative reference prices; request a written quotation on the pricing page before you commit.

All figures quoted are indicative 'from' reference prices on our published rate card; final numbers are confirmed in a written quotation.

Next step

Send us both quotes and request a written, line-by-line landed-cost worksheet on the pricing page, or contact us to review the incoterms.

Want to source something similar?

Send a short brief and we will come back with a plan and a transparent quote.

Get a Free Quote
WhatsAppAsk us a question